{"id":167,"date":"2016-02-15T08:43:10","date_gmt":"2016-02-15T08:43:10","guid":{"rendered":"http:\/\/www.mub.eps.manchester.ac.uk\/eee\/?p=167"},"modified":"2018-03-13T17:34:13","modified_gmt":"2018-03-13T17:34:13","slug":"third-time-lucky","status":"publish","type":"post","link":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/","title":{"rendered":"Third Time Lucky"},"content":{"rendered":"<p>This week has been a momentous step in the hardware side of the project. After weeks of prototyping the entire system on breadboard (some said this was impossible), the circuit is finally at a finalised stage.<\/p>\n<p>Weeks of slight changes, and many factors still to be decided, meant this stage has come a lot later than I\u2019d hoped. The PCB essentially draws the line on the final circuit, with it being virtually impossible to make any changes after this point. It\u2019s now done, but it didn\u2019t go too smoothly.<\/p>\n<p><strong>FIRST TIME AROUND<\/strong><\/p>\n<p>The first thing I learnt about real PCB design is that I\u2019m expected to do a lot of the work. After years of being used to library components and footprints, suddenly this wasn\u2019t the case. Basic components such as resistors have a stock footprint, meaning a straight transfer from the circuit diagram to the PCB. The use of more \u2018exotic\u2019 components, such as specific modules, chips and diodes, aren\u2019t however stock.<\/p>\n<p>This means designing a schematic \/ footprint for each of these devices (consisting of around half the unique components used). It\u2019s fair to say this didn\u2019t go to plan first time around.<\/p>\n<p>Issues including mounting holes being too small and incorrect pin mappings meant version 1.0 was a write off. Back to the design file, amendments were made, but version 1.1 didn\u2019t even make it to production. The PCB office rejected the design for violating a few manufacturing requirements (issues with pad sizes and routing constraints).<\/p>\n<p><strong>&#8216;FAVOURITE TOY&#8217;<\/strong><\/p>\n<p>Finally, version 1.2 was completed and ready to be populated (all the components fitted). In the context of Electronic Engineering, if 3<sup>rd<\/sup> Year Project is the \u2018dream\u2019 every child has, then populating a PCB is every child\u2019s \u2018favourite toy\u2019. Finding and soldering components is just about the most fun you can have as an electronic engineer.<\/p>\n<p>At the time of writing, there\u2019s a couple of components missing, preventing testing the PCB. In due course it will be tested, and fingers crossed it\u2019ll work!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>This week has been a momentous step in the hardware side of the project. After weeks of prototyping the entire system on breadboard (some said this was impossible), the circuit is finally at a finalised stage. Weeks of slight changes, and many factors still to be decided, meant this stage has come a lot later [&hellip;]<\/p>\n","protected":false},"author":126,"featured_media":168,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_genesis_hide_title":false,"_genesis_hide_breadcrumbs":false,"_genesis_hide_singular_image":false,"_genesis_hide_footer_widgets":false,"_genesis_custom_body_class":"","_genesis_custom_post_class":"","_genesis_layout":"","jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[2],"tags":[24,37,22],"class_list":{"0":"post-167","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-student-experience","8":"tag-3rd-year","9":"tag-alec","10":"tag-undergraduate","11":"entry"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Third Time Lucky - Department of Electrical and Electronic Engineering Blog<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Third Time Lucky - Department of Electrical and Electronic Engineering Blog\" \/>\n<meta property=\"og:description\" content=\"This week has been a momentous step in the hardware side of the project. After weeks of prototyping the entire system on breadboard (some said this was impossible), the circuit is finally at a finalised stage. Weeks of slight changes, and many factors still to be decided, meant this stage has come a lot later [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/\" \/>\n<meta property=\"og:site_name\" content=\"Department of Electrical and Electronic Engineering Blog\" \/>\n<meta property=\"article:published_time\" content=\"2016-02-15T08:43:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-03-13T17:34:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-content\/uploads\/sites\/48\/2016\/05\/IMG_0969.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"4559\" \/>\n\t<meta property=\"og:image:height\" content=\"3039\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Alec Owens\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Alec Owens\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/2016\\\/02\\\/15\\\/third-time-lucky\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/2016\\\/02\\\/15\\\/third-time-lucky\\\/\"},\"author\":{\"name\":\"Alec Owens\",\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/#\\\/schema\\\/person\\\/3fd5c154d12ac26b8d7304672e130b28\"},\"headline\":\"Third Time Lucky\",\"datePublished\":\"2016-02-15T08:43:10+00:00\",\"dateModified\":\"2018-03-13T17:34:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/2016\\\/02\\\/15\\\/third-time-lucky\\\/\"},\"wordCount\":345,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/2016\\\/02\\\/15\\\/third-time-lucky\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/wp-content\\\/uploads\\\/sites\\\/48\\\/2016\\\/05\\\/IMG_0969.jpg\",\"keywords\":[\"3rd year\",\"Alec\",\"undergraduate\"],\"articleSection\":[\"Student experience\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/2016\\\/02\\\/15\\\/third-time-lucky\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/2016\\\/02\\\/15\\\/third-time-lucky\\\/\",\"url\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/2016\\\/02\\\/15\\\/third-time-lucky\\\/\",\"name\":\"Third Time Lucky - Department of Electrical and Electronic Engineering Blog\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/2016\\\/02\\\/15\\\/third-time-lucky\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/2016\\\/02\\\/15\\\/third-time-lucky\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/wp-content\\\/uploads\\\/sites\\\/48\\\/2016\\\/05\\\/IMG_0969.jpg\",\"datePublished\":\"2016-02-15T08:43:10+00:00\",\"dateModified\":\"2018-03-13T17:34:13+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/2016\\\/02\\\/15\\\/third-time-lucky\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/2016\\\/02\\\/15\\\/third-time-lucky\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/2016\\\/02\\\/15\\\/third-time-lucky\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/wp-content\\\/uploads\\\/sites\\\/48\\\/2016\\\/05\\\/IMG_0969.jpg\",\"contentUrl\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/wp-content\\\/uploads\\\/sites\\\/48\\\/2016\\\/05\\\/IMG_0969.jpg\",\"width\":4559,\"height\":3039,\"caption\":\"Finally, a fully populated working PCB.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/2016\\\/02\\\/15\\\/third-time-lucky\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Third Time Lucky\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/#website\",\"url\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/\",\"name\":\"Department of Electrical and Electronic Engineering Blog\",\"description\":\"Communicating electrical and electronic engineering at - The University of Manchester\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/#organization\",\"name\":\"Department of Electrical and Electronic Engineering Blog\",\"url\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/wp-content\\\/uploads\\\/sites\\\/48\\\/2017\\\/12\\\/logo-university-of-manchester.png\",\"contentUrl\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/wp-content\\\/uploads\\\/sites\\\/48\\\/2017\\\/12\\\/logo-university-of-manchester.png\",\"width\":206,\"height\":86,\"caption\":\"Department of Electrical and Electronic Engineering Blog\"},\"image\":{\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/#\\\/schema\\\/person\\\/3fd5c154d12ac26b8d7304672e130b28\",\"name\":\"Alec Owens\",\"description\":\"3rd Year Electrical &amp; Electronic Engineer at the University of Manchester.\",\"url\":\"https:\\\/\\\/www.mub.eps.manchester.ac.uk\\\/eee\\\/author\\\/alexanderowens\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Third Time Lucky - Department of Electrical and Electronic Engineering Blog","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/","og_locale":"en_GB","og_type":"article","og_title":"Third Time Lucky - Department of Electrical and Electronic Engineering Blog","og_description":"This week has been a momentous step in the hardware side of the project. After weeks of prototyping the entire system on breadboard (some said this was impossible), the circuit is finally at a finalised stage. Weeks of slight changes, and many factors still to be decided, meant this stage has come a lot later [&hellip;]","og_url":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/","og_site_name":"Department of Electrical and Electronic Engineering Blog","article_published_time":"2016-02-15T08:43:10+00:00","article_modified_time":"2018-03-13T17:34:13+00:00","og_image":[{"width":4559,"height":3039,"url":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-content\/uploads\/sites\/48\/2016\/05\/IMG_0969.jpg","type":"image\/jpeg"}],"author":"Alec Owens","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Alec Owens","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/#article","isPartOf":{"@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/"},"author":{"name":"Alec Owens","@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/#\/schema\/person\/3fd5c154d12ac26b8d7304672e130b28"},"headline":"Third Time Lucky","datePublished":"2016-02-15T08:43:10+00:00","dateModified":"2018-03-13T17:34:13+00:00","mainEntityOfPage":{"@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/"},"wordCount":345,"commentCount":0,"publisher":{"@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/#organization"},"image":{"@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-content\/uploads\/sites\/48\/2016\/05\/IMG_0969.jpg","keywords":["3rd year","Alec","undergraduate"],"articleSection":["Student experience"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/","url":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/","name":"Third Time Lucky - Department of Electrical and Electronic Engineering Blog","isPartOf":{"@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/#primaryimage"},"image":{"@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/#primaryimage"},"thumbnailUrl":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-content\/uploads\/sites\/48\/2016\/05\/IMG_0969.jpg","datePublished":"2016-02-15T08:43:10+00:00","dateModified":"2018-03-13T17:34:13+00:00","breadcrumb":{"@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/#primaryimage","url":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-content\/uploads\/sites\/48\/2016\/05\/IMG_0969.jpg","contentUrl":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-content\/uploads\/sites\/48\/2016\/05\/IMG_0969.jpg","width":4559,"height":3039,"caption":"Finally, a fully populated working PCB."},{"@type":"BreadcrumbList","@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/2016\/02\/15\/third-time-lucky\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/"},{"@type":"ListItem","position":2,"name":"Third Time Lucky"}]},{"@type":"WebSite","@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/#website","url":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/","name":"Department of Electrical and Electronic Engineering Blog","description":"Communicating electrical and electronic engineering at - The University of Manchester","publisher":{"@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/#organization","name":"Department of Electrical and Electronic Engineering Blog","url":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/#\/schema\/logo\/image\/","url":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-content\/uploads\/sites\/48\/2017\/12\/logo-university-of-manchester.png","contentUrl":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-content\/uploads\/sites\/48\/2017\/12\/logo-university-of-manchester.png","width":206,"height":86,"caption":"Department of Electrical and Electronic Engineering Blog"},"image":{"@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/#\/schema\/person\/3fd5c154d12ac26b8d7304672e130b28","name":"Alec Owens","description":"3rd Year Electrical &amp; Electronic Engineer at the University of Manchester.","url":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/author\/alexanderowens\/"}]}},"jetpack_featured_media_url":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-content\/uploads\/sites\/48\/2016\/05\/IMG_0969.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-json\/wp\/v2\/posts\/167","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-json\/wp\/v2\/users\/126"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-json\/wp\/v2\/comments?post=167"}],"version-history":[{"count":2,"href":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-json\/wp\/v2\/posts\/167\/revisions"}],"predecessor-version":[{"id":248,"href":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-json\/wp\/v2\/posts\/167\/revisions\/248"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-json\/wp\/v2\/media\/168"}],"wp:attachment":[{"href":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-json\/wp\/v2\/media?parent=167"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-json\/wp\/v2\/categories?post=167"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mub.eps.manchester.ac.uk\/eee\/wp-json\/wp\/v2\/tags?post=167"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}